03 5258 3663
kwf@helixsteel.com.au
Project Name: Connewarre WTP – Barwon Heads, Victoria
Industry: Infrastructure - Slipform Ring Beam

Helix Micro Rebar replaced all of the rebar for this ring beam that was specified with N12@200 each way top and bottom and N12@200 each way EF. 

This was constructed using a sliporm machine with the Helix reinforced concrete delivered at a very low 3-40mm slump. 

The ring beam surrounds this massive water basin, holding in place a PVC liner and PVC lining.