Helix replaced 1 layer of SL82 mesh in a 125mm thick slab and 2 layers of trench mesh in the perimeter footing for this project.
The Helix provided an increase in the crack resistance of 20% and saved the client over 20% of the steel supply and placing costs.
All of the concrete was pumped through a 100mm line pump.