03 5258 3663
kwf@helixsteel.com.au
Project Name: Duck Ponds – Orange, New South Wales
Industry: Local Government - Shotcrete

Helix Micro Rebar was used to build a sizeable duck pond in Orange, New South Wales. Helix was shotcreted to allow for water retention and replaced the use of mesh within the pond.  

The construction schedule was significantly reduced, and the client was very pleased with the ease of the project and the reduction of labour costs. 

The cost benefit was over 20%.