Helix Micro Rebar replaced all of the rebar for this ring beam that was specified with N12@200 each way top and bottom and N12@200 each way EF.
This was constructed using a sliporm machine with the Helix reinforced concrete delivered at a very low 3-40mm slump.
The ring beam surrounds this massive water basin, holding in place a PVC liner and PVC lining.