This Municipal Council laid a new footpath alongside a local primary school in a coastal town in Victoria. The path is 1.5m wide and 100mm deep. The Helix Steel dosage was 5kg/m3.
The customer required a non-slip broom finish and this was carried out by the concreters with no Helix visible on the surface.