Helix Micro Rebar has been used in the AFS permanent formwork walls in this 14-storey apartment complex.
Helix dosages of 11 – 15kg/m3 reduced the vertical bar size and eliminated the horizontal reinforcement in the walls, leading to a faster installation time and overall cost savings.