The 200mm thick Dincel walls in the basement were installed with a dosage of 10kg/m3 of Helix Micro Rebar and N12-200 EF vertical only, eliminating the specified N12-300 horizontal EF and reducing the size of the N16-250 vertical EF.
11Kg/m3 of Helix Micro Rebar replaced all of the 6-L12 TM top and bottom trench mesh reinforcement in the strip footings. Also, 8Kg/m3 of Helix Micro Rebar was used to replace the specified N12-200 EW T&B for the pad footings.