03 5258 3663
kwf@helixsteel.com.au
Project Name: South Australian Warehouse
Industry: Storage and Racking Facility

Helix TSMR was used in this storage and racking facility warehouse in Wingfield South Australia. The slabs have semi-trailer and forklift loadings.

With Helix TSMR we were able to pour the piers the same day as they were dug, thus reducing the potential undermining of neighbouring properties and keeping the site safe without leaving the piers open or having to barricade overnight.

The project was 4300 square metres. No concrete pump was required. The use of Helix resulted in a cost saving compared with the supply and placement of traditional reinforcement and it reduced the time needed for completion of the overall project.